![]() Approximate project length is about 1300 in. Replace and repair existing 4-foot wide plain concrete sidewalk on the east side of the street. Construct a new 8" thick, 25-foot wide reinforced concrete pavement with integral curb and 6" compacted stone base. Sewer and water line adjustments are anticipated. ![]() Work includes sidewalk, driveway, and selected areas of street repair. This new system will replace the existing inadequate and faulty drainage system along this route. Scope of Work: Installation of new storm water drainage pipe and drainage basins along the East side of 4th avenue commencing at High School Park lateral (just south of 1st street) and terminating at the intersection with 6th street. 4th Avenue Drainage Improvements - 6th Street to High School Park Lateral.Right of way acquisition for the relocation of utilities and roadway expansion is anticipated. will be implemented in the scope of work for the project. Other improvements such as City-owned utility relocations, sidewalks, etc. The existing open roadside ditches will be replaced by a subsurface drainage system. Scope of Work: Replacing an existing two lane asphalt concrete roadway with a four-lane concrete curb and gutter roadway. 10" thick reinforced concrete pavement with curb and gutter. Water lines will remain in place where possible, portions will be replaced. 2 new sanitary lift stations will be installed along with gravity sewer lines. All will be reconstructed with enclosed ditches with a new underground drainage system. east to Rue Chann Ann Henderson Bayou Rd. at the intersections of Bilbo and Division St as well as Bilbo and Mill St Scope of Work: This project will concentrate on the traffic control and walkability of the streetscape by providing enhancement improvements consisting of special sidewalk paving, ADA improvements, parking bump outs, traffic control devices, etc. Downtown Streetscape Phase II - Bilbo St between Division St & Mill St.of 20/24-inch water main on Highway 14 North from Gerstner Memorial Blvd to East McNeese Street. Scope of Work: Installation of approximately 6,600 ft. SE WTP Distribution System - HWY 14 Waterline Extension (Gerstner Memoerial Blvd.of 24-inch water main on Red Davis McCollister Rd from South Park Dr. Scope of Work: Installation of approximately 6,000 ft. SE WTP Distribution System - Red David McCollister Rd.Scope of Work: Installation of approximately 13,100 ft. SE WTP Distribution System - Gauthier Rd. ![]() Scope of Work: Design of approximately 5000 ft of 24" inch water main on South Parrk Drive from E.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |